Designer's table with kitchen front samples, stone chips and a 3D kitchen plan on a tablet

Design services

Our kitchen design process, from first visit to delivery

A German kitchen is built to order, so the work happens in a deliberate sequence: understand, measure, design, confirm, order, deliver. Here is what each stage of our kitchen design process involves and what you decide along the way.

Illustrative interior

01Six stages

The kitchen design process, step by step

  1. 01

    Visit the showroom

    We meet in Glendale, talk through your routines, wishes and budget range, and look at fronts, worktops and lighting together.

  2. 02

    Measure

    We confirm wall lengths, ceiling height, windows and the positions of water, gas, power and ventilation, or work from your architect’s drawings.

  3. 03

    Design in 3D

    Your designer plans the kitchen in 3D with real Nolte modules, then refines it with you until it fits.

  4. 04

    Specification and quote

    Every unit, front, handle, fitting and light is listed in the quote, so you can see exactly what you are approving.

  5. 05

    Order from Germany

    After approval, your kitchen is ordered from Nolte and built to your specification in Germany.

  6. 06

    Delivery and installation

    We coordinate delivery to your home and can coordinate installation with vetted professionals or your own contractor.

02Timing

What affects lead time

Because every Nolte kitchen is made to order and shipped from Germany, we do not quote a standard timeline on this page. We confirm the expected lead time when your order is placed, based on your specification and the factory schedule at that moment.

Several things shape the overall timeline: how quickly design decisions are made; whether your architect, contractor or homeowners’ association needs to review drawings; production and freight to California; and how ready the site is, with walls, floors and plumbing and electrical rough-in in place. Stone worktops are usually templated once the cabinets are installed, which adds its own step at the end.

The surest way to keep a project moving is to finalize appliances early. They fix more cabinet dimensions than anything else, and our 3D kitchen design stage depends on them.

03Your decisions

What you decide, and when

  • Layout

    Island or peninsula, galley or L-shape: settled in the first design rounds. See our layout guide.

  • Appliances

    Models and sizes, chosen before the plan is finalized so apertures fit exactly.

  • Fronts and colors

    Front family, finish and handle concept, confirmed with samples in the showroom.

  • Worktop

    Material, thickness and edge, plus where the backsplash starts and stops.

  • Lighting and power

    Under-cabinet, plinth and display lighting, outlets and switching, coordinated with your electrician.

  • Inside the cabinets

    Drawer organizers, larder pull-outs, corner solutions and waste sorting.

Black matt island with light worktop and tall black units on a wood floor
Nolte Küchen design

04On site

Who does what when the kitchen arrives

NOVAHAUS designs, specifies and orders your kitchen, and we coordinate its delivery. For installation, we can coordinate with vetted professionals or work alongside the contractor you already have.

Building work around the kitchen, such as demolition, plumbing, electrical and any permits your project needs, sits with your contractor or architect. We share drawings early so their work lines up with the cabinets to the inch. If you are planning a larger renovation, our kitchen remodel page covers how the pieces fit together.

05Checklist

Bring these to your first meeting

Floor plan
Architect’s drawings, a realtor plan or a hand sketch with wall lengths
Photos
Each wall of the room, plus the view into adjoining spaces
Ceiling height
Measured in two or three places; older homes are rarely level
Appliances
Models you are keeping or considering, with their widths
Timing
Any fixed dates, such as a move-in or a wider renovation schedule
Budget range
A range rather than a number; we will show what it buys

FAQ

Questions, answered

Still deciding? Call +1 (213) 776-0000 or send us your plan.

How long does a Nolte kitchen take?
We confirm lead time when the order is placed. It depends on your specification, the factory schedule, freight to California and site readiness, and we keep you informed at each step.
Do you install kitchens?
We coordinate delivery and can coordinate installation with vetted professionals, or work with your own contractor. Construction work around the kitchen is handled by your contractor.
When should I start planning relative to construction?
As early as possible. A finished design tells your contractor exactly where water, power and ventilation must go, which avoids rework once walls are closed.
Can I change the order after it is placed?
Units are built to your specification, so changes after ordering may not be possible. That is why we review the 3D design and quote with you line by line before approval.

Consultation

Plan your project with a NOVAHAUS designer

Bring a floor plan, a photo or simply an idea. We will walk the showroom with you, talk through layout, materials and budget, and map out the next steps.